On the flip side burying drain pipe is more work intensive but it s a guaranteed way to keep water away.
Cutting pipes to make gutter.
Use the old adage measure twice and cut once then turn the gutter upside down on the table and mark it all the way around.
We suggest topping the pipe off with a pop up emitter.
The narrow strip is then cut into lengths and used to strap the gutter in position.
Install the gutter and run your 1 5 downspout with 90 degree or 45 degree depending on your configuration.
Use pvc cement to connect whole unsplit pipe using lengths of pipe joined by couplers.
Then cut the top 1 3 to 1 2 of top of the pipe off.
Make sure to seal the drop outlet to the gutter with seam sealer.
The most difficult part is digging the trench.
This is cutting and joining gutter angles by ace gutters pty ltd on vimeo the home for high quality videos and the people who love them.
If you are by yourself try a few bands of masking tap to help hold them tight together for gluing.
You can cut out the larger hole with a tin snips or you could use an oscillating multi tool equipped with a metal cutting blade.
Build the entire gutter system and cement it together before splitting the pipe and couplers to create two halves.
A downspout would be very simple to make as well just simply glue in two end caps and a 3 x3 x1 5 tee to your 3 pvc pipe.
Use a carpenter s square to get around to the bottom.
Save one or cut both lay the pipes out on a reasonably flat surface the flatter the better.
Stitch the pipes together with hot glue 4 6 of glue every two feet.
They cut a narrow slit along the length of the pipe just wide enough for the corrugations to fit inside the pipe.
Simply buy to lengths of the same size pipe you wish to cut in half.
Besides making sure the slope is correct you ll want to make sure the pipe run ends in a good location.